Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3958.65
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jul 16, 2009     Main switch console; map pocket - (3.0 hours)       Category: Fuselage
Today, I riveted several of the stiffener angles to the right switch console, and clecoed the assembly in place to the right instrument subpanel and right vertical channel cover. As I suspected, the console is nice and sturdy; however, the lower edge of it moved laterally about 1/8" with about five pounds of hand pressure. Since I want this console to be very sturdy, I fabricated a cross brace between the lower inside stiffener and the sidewall of the cockpit. (Actually, I used the existing, "extra" stiffener that was designed for the stock switch panel.) The cross-brace is merely a 4" piece of 1/4" aluminum tube, flattened on both ends and drilled for attach screws/bolts. The console is now rock-solid. Sweet!

I also riveted the stiffener on the lower-right map pocket, and it's now ready to paint and install.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.